RM PCamp 2012 Smack Down—Post 3

20120424_191822

Ouch – a new requirement was thrown in to the mix.  A representative from the “marketing group” just received competitive intelligence that a rival is adding a spiral to their marble run.

 

 

 

 

20120424_191923The teams now need to do the same.  With 25 minutes remaining, the teams responded to the requirement in seconds, trying prototypes that could be worked into their plans.

 

 

 

 

 

20120424_191844The team to the left was meeting the requirements for length, in part by starting their marble run more than 10’ off the floor.  However, they found the ball had too much momentum to make it through a spiral – back to the drawing board.

You may also like